Sign in
4YRSEtop Technology Co., Ltd.

COMPANY OVERVIEW

Company Album

Basic Information

PRODUCT CAPACITY

Production Flow

Confirm cell capacity
Confirm the capacity and internal resistance of each single cell, and distinguish between different grades
Battery pack welding
The matched battery pack is welded by a laser spot welder to ensure that the series and parallel connection are correct
Battery pack aging test
The welded semi-finished battery pack is used for charging, discharging, voltage, internal resistance and other performance tests
Battery pack aging test
All battery packs are subject to charge discharge cycle aging test. 1. fully charged; 2. Discharge to cut-off voltage; 3. Recharge to nominal voltage
ready for packaging
All batteries after aging test start to be installed into the shell, and then use the performance tester to test the battery performance again

Factory Information

Factory Size
10,000-30,000 square meters
Factory Country/Region
Tangxia Town, Dongguan City, Guangdong Province
No. of Production Lines
Above 10
Contract Manufacturing
OEM Service Offered, Design Service Offered, Buyer Label Offered
Annual Output Value
Above US$100 Million

Facilities

Facilities
Supervisor
NO.of Operators
NO.of In-line QC/QA
Verified
Line 1
2
39
3
Line 2
2
43
2
Line 3
2
46
3
Line 4
2
45
3
Line 5
2
42
3
Line 6
2
43
3
Verified

QUALITY CONTROL

Quality Management Process

Confirm cell capacity
Confirm the capacity and internal resistance of each single cell, and distinguish between different grades
Battery performance test
The semi-finished battery pack is charged, discharged, voltage, internal resistance and other performance tests through the performance tester
Battery pack aging test
All battery packs are subject to charge discharge cycle aging test.

R&D CAPACITY

R&D Process

High and low temperature test
Each newly developed battery, Will carry out low temperature aging test of minus 20 and high temperature of 60

Research & Development

21 - 30 People